Huadongtrack Professional Manufacturer, IAAF 400 Meter Standard Track Prefabricated Rubber Running Floor

FOB Reference Price:Get Latest Price
US $20-30 / Square Meter | 100 Square Meter/Square Meters (Min. Order)
Supply Ability:
30000 Square Meter/Square Meters per Month
Ningbo port
Report Suspicious Activity
Quick Details
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
Model Number:
running, Running Flooring
IAAF,ISO9001 and ISO14001
6mm ~ 14mm
Top Layer:
EPDM layer
Bottom Layer:
NR Layer
Concrete, Asphalt
Other material:
glue water is needed
Weather condition:
all weather condition
Environmental condition:
no contain of heavy metal
Packaging & Delivery
Packaging Details
Delivery Time
Shipped in 15 days after payment

IAAF Product Certificate, IAAF Class 1st Athletics Facility Certificate,ISO9001 and ISO14001


Huadongtrack® is IAAF approved Prefabricated Rubber Running Flooring made from synthetic and natural rubber compounds,mineral fillers, color pigments,stabilizing agents and other materials.

Adpot close-cell micro-bubbling and continuous vulcanization technology, makes track incredible elasticity and duration.Huadongtrack® is manufactured in high controlled process, meets IAAF performance specification.


Durable enough to bear abrasion, spike damage,ultra violet exposure,water, moisture and extremely weather condition.



1. The upper layer is heat-vulcanized honeycomb base, with special structure angled in the direction of running,  which differentiates the biomechanical responsedepending on the type stress generated by athletes.

2. The bottom layer has been specially designed to boost vertical deformation, giving athlete a sense of comfort while training.


HDPD-1, IAAF Approved Prefabricated Rubber Running Floor, Red

Packing in rolls, roll width:1m~1.3m, length:10m~15m, Thickness:6mm~14mm,

Upper layer: EPDM layer, Bottom layer:SBR Layer


HDPD-2, IAAF Approved Prefabricated Rubber Running Floor,Green

Packing in rolls, roll width:1m~1.3m, length:10m~15m, Thickness:6mm~14mm,

Upper layer: EPDM layer, Bottom layer:SBR Layer


HDPD-3, IAAF Approved Prefabricated Rubber Running Floor,Blue



Packing in rolls, roll width:1m~1.3m, length:10m~15m, Thickness:6mm~14mm,

Upper layer: EPDM layer, Bottom layer:SBR Layer


HDPD-4,IAAF Approved Prefabricated Rubber Running Floor,Grey



1)Ground requirements:Cement, or, Asphalt. The ground should be smooth enough.

2)Glue(Two Components Polyurethane Adhesive) is needed to paste the track to the ground.

3)Different tools is needed for installation, such as rulers, small trailer, mixer, barrels, bricks, cutting knifes and so on.


Ground leveling,


Start Installing,


How to install curve ?

Curve installation very easy, because running track is elastic and very flexible, installing it using  its nature flexible, just the same as installing the straight way.


How to deal with joints ?

First,very nature combination by glue, if at some joints, glue can not combined the joints well, then see the use of U type air nail gun to beat nails as following

Lines marking


Packaging & Shipping


Our Services

Supply of prefabricated rubber running track material,

Supply of two components polyurethane adhesive,(installing running track is needed)

Supply of Tools for installation,

Supply of Technicians to guide installation,

Supply of equipments need to pre-installed, such as shot put circle, long jump toe and etc.


Ms. Shirley Service for you, :)

1)You can leave me message,or, send me email 

2) Skype: ye_juan_juan    Mobile/IMO/Wechat:0086 13606518011

All your questions will be responsed within 24 hours by Shirley


Production Picture:


Some Projects We've Done

Asia Sport Game Stadium Incheon 2014


Winter Olympic Games Stadium Sochi 2014


Thanks for your precious time :)